AUTOMATION IN CONSTRUCTION
AUTOMATION IN CONSTRUCTION(英文缩写 AUTOMAT CONSTR),ISSN 0926-5805,eISSN 1872-7891 是一本学术期刊。本页汇总该期刊的最新影响因子、分区信息以及最新收录于 PubMed 的文献,帮助您快速了解期刊全貌。
指标来源:jcr_cas_ifqb
期刊简介
暂无简介。
历年影响因子趋势
| 年份 | 影响因子 | JCR 分区 |
|---|---|---|
| - | Q1 | |
| - | Q1 | |
| - | Q1 | |
| - | Q1 | |
| - | Q1 |
AUTOMATION IN CONSTRUCTION 最新收录文献
-
Enhancing BIM security in emergency construction projects using lightweight blockchain-as-a-service.
Rapid design and construction of mobile cabin hospitals (MCHs) have become imperative in the COVID-19 response. However, due to unique design specifications (e.g., parallel design and model pre-revisi…
-
Collision-free trajectory planning for robotic assembly of lightweight structures.
This research presents a trajectory planning approach for robotic assembly of lightweight structures for COVID-19 healthcare facilities. The prefabricated building components of COVID-19 healthcare fa…
-
BIM-based task and motion planning prototype for robotic assembly of COVID-19 hospitalisation light weight structures.
Fast transmission of COVID-19 led to mass cancelling of events to contain the virus outbreak. Amid lockdown restrictions, a vast number of construction projects came to a halt. Robotic platforms can p…
-
Enhancing resilience in construction against infectious diseases using stochastic multi-agent approach.
To recover from the adverse impacts of COVID-19 on construction and to avoid further losses to the industry in future pandemics, the resilience of construction industry needs to be enhanced against in…
-
{"_":"Modular composite building in urgent emergency engineering projects: A case study of accelerated design and construction of to COVID-19 pandemic.","b":["Wuhan Thunder God Mountain/Leishenshan hospital"]}
Wuhan Leishenshan/Leishenshan ("Leishenshan" for short) hospital is a makeshift emergency hospital for treating patients diagnosed with the novel coronavirus-infected pneumonia (NCIP). Engineering con…
-
Fusing imperfect experimental data for risk assessment of musculoskeletal disorders in construction using canonical polyadic decomposition.
Field or laboratory data collected for work-related musculoskeletal disorder (WMSD) risk assessment in construction often becomes unreliable as a large amount of data go missing due to technology-indu…
-
{"_":"Ultra-rapid delivery of specialty field hospitals to combat COVID-19: Lessons learned from the Hospital project in Wuhan.","i":["Leishenshan"]}
With the outbreak of the 2019 novel coronavirus (COVID-19) epidemic in Wuhan, China, in January 2020, the escalating number of confirmed and suspected cases overwhelmed the admission capacity of the d…
-
Sustainability appraisal in infrastructure projects (SUSAIP): Part 1. Development of indicators and computational methods.
The process of translating strategic sustainability objectives into concrete action at project-specific levels is a difficult task. The multi-dimensional perspectives of sustainability such as economy…