AUTOMATION IN CONSTRUCTION

AUTOMATION IN CONSTRUCTION(英文缩写 AUTOMAT CONSTR),ISSN 0926-5805,eISSN 1872-7891 是一本学术期刊。本页汇总该期刊的最新影响因子、分区信息以及最新收录于 PubMed 的文献,帮助您快速了解期刊全貌。

2026 年数据 · 影响因子
12.600
JCR 分区
Q1
CAS 分区
B1
近一年发文量
0

指标来源:jcr_cas_ifqb

ISSN: 0926-5805 · eISSN: 1872-7891 · 缩写: AUTOMAT CONSTR

期刊简介

暂无简介。

历年影响因子趋势

年份影响因子JCR 分区
-Q1
-Q1
-Q1
-Q1
-Q1

AUTOMATION IN CONSTRUCTION 最新收录文献

  1. Enhancing BIM security in emergency construction projects using lightweight blockchain-as-a-service.

    Rapid design and construction of mobile cabin hospitals (MCHs) have become imperative in the COVID-19 response. However, due to unique design specifications (e.g., parallel design and model pre-revisi…

    查看详情 DOI
  2. Collision-free trajectory planning for robotic assembly of lightweight structures.

    This research presents a trajectory planning approach for robotic assembly of lightweight structures for COVID-19 healthcare facilities. The prefabricated building components of COVID-19 healthcare fa…

    查看详情 DOI
  3. BIM-based task and motion planning prototype for robotic assembly of COVID-19 hospitalisation light weight structures.

    Fast transmission of COVID-19 led to mass cancelling of events to contain the virus outbreak. Amid lockdown restrictions, a vast number of construction projects came to a halt. Robotic platforms can p…

    查看详情 DOI
  4. Enhancing resilience in construction against infectious diseases using stochastic multi-agent approach.

    To recover from the adverse impacts of COVID-19 on construction and to avoid further losses to the industry in future pandemics, the resilience of construction industry needs to be enhanced against in…

    查看详情 DOI
  5. {"_":"Modular composite building in urgent emergency engineering projects: A case study of accelerated design and construction of to COVID-19 pandemic.","b":["Wuhan Thunder God Mountain/Leishenshan hospital"]}

    Wuhan Leishenshan/Leishenshan ("Leishenshan" for short) hospital is a makeshift emergency hospital for treating patients diagnosed with the novel coronavirus-infected pneumonia (NCIP). Engineering con…

    查看详情 DOI
  6. Fusing imperfect experimental data for risk assessment of musculoskeletal disorders in construction using canonical polyadic decomposition.

    Field or laboratory data collected for work-related musculoskeletal disorder (WMSD) risk assessment in construction often becomes unreliable as a large amount of data go missing due to technology-indu…

    查看详情 DOI
  7. {"_":"Ultra-rapid delivery of specialty field hospitals to combat COVID-19: Lessons learned from the Hospital project in Wuhan.","i":["Leishenshan"]}

    With the outbreak of the 2019 novel coronavirus (COVID-19) epidemic in Wuhan, China, in January 2020, the escalating number of confirmed and suspected cases overwhelmed the admission capacity of the d…

    查看详情 DOI
  8. Sustainability appraisal in infrastructure projects (SUSAIP): Part 1. Development of indicators and computational methods.

    The process of translating strategic sustainability objectives into concrete action at project-specific levels is a difficult task. The multi-dimensional perspectives of sustainability such as economy…

    查看详情 DOI

在 AUTOMATION IN CONSTRUCTION 中搜索更多文献

支持中英文检索 · 智能翻译 · 影响因子 · PDF 下载 · AI 文献阅读

指标接近的期刊